... | @@ -148,7 +148,7 @@ The EOL Phase 1 for a Yearly or Release Stream starts 6 months after the new ver |
... | @@ -148,7 +148,7 @@ The EOL Phase 1 for a Yearly or Release Stream starts 6 months after the new ver |
|
* Container images are available.
|
|
* Container images are available.
|
|
* Documentation is available.
|
|
* Documentation is available.
|
|
* Packages and installation scripts are available.
|
|
* Packages and installation scripts are available.
|
|
* The ELT DevEnv team may postpone this phase for a cost of 0.1 FTE yearly, covered by the requesting party.
|
|
* The ELT DevEnv team may postpone this phase for a cost of 0.1 FTE yearly, covered by the requester.
|
|
|
|
|
|
**EOL Phase 2**
|
|
**EOL Phase 2**
|
|
|
|
|
... | | ... | |